BAB 485 MBD Sustainable Facilities

Owner: Abu Dhabi Gas Processing

ADNOC ONSHORE intends to increase crude oil production from current rate of 1.8 MMSTBOPD to 2.0 MMSTBOPD. This increase in production will be achieved by developing different reserves (building blocks development) in ADNOC ONSHORE fields.

Timeline Pipe Production August / September 2021

Pipe Grade/Size/Quantity

  • API 5L X60MS 18" x 9.53 / 10.31 mm 20" x 9.53 / 11.13 mm
  • Total 54.2 km / 6354 tons
  • Plate Mill Voestalpine , Austria

Pipe Grade/Size/Quantity

  • ADNOC ES 30-99-00-0106 & SHELL DEP 31.40.20.37
  • CVN for pipe body, weld and FL & DWTT at -29 deg.C CTOD at -29 degr. C – challenging due to small WT 9.53 mm, plate produced TMCP + AC (Accelerated Cooling).
  • HIC to NACE TM0284 / SSCC to NACE TM0177
  • Weldability Test
  • External 3LPE coating done by Group Company NPCC